GOV RADAR / آسيا

نيبال

Nepal · NP

تحديث 2026-11-07 · حتى 2026/27 예산(2026-05-29 발표), 2026-03 총선·총리 취임, ADB 공고(2026-05~08) · مستقر

After the Gen-Z protests, the RSP won 122 of 165 constituency seats in the March 2026 election and Balen Shah became PM. The Rs2.12tn FY2026/27 budget targets 7% growth and exit from the AML grey list.

ما يمكن للشركة الكورية فعله الآن

اطلب موجز دخول السوق

الحكومة · القيادة

Prime Minister Balendra (Balen) Shah (head of government, Rastriya Swatantra Party, sworn in 27 Mar 2026)

الأولويات الوطنية

  • Early exit from the FATF grey list and financial reform
  • 7% GDP growth with inflation under 6%
  • Connect 670 MW hydro and 370 MW solar, lifting capacity to 5,535 MW
  • Sovereign wealth fund and a 'Motherland Fund' for strategic projects (3-month fuel reserves, AI factories)
  • Tech hub push, digital public infrastructure and centralised government software procurement
  • 90% health insurance coverage within three years

البرامج الحكومية

FY2026/27 federal budgetRs2.12tn (allocated)

Recurrent Rs1.27tn (59.8%), capital Rs431.1bn (20.3%), financial management Rs422.6bn. Revenue target Rs1.4tn; financing gap Rs657.3bn (foreign loans 247.3bn, domestic 410bn)

الجهةMinistry of Finance (Minister Swarnim Wagle)
الميزانيةRs2.12tn (allocated)
الحالةجارٍ
المصادر
Roads and urban developmentRs286.48bn (allocated)

Largest allocation, Rs286.48bn; Postal Highway Rs4.65bn, Pushpalal Mid-Hill Highway 65 km Rs2.16bn, Madan Bhandari Highway 25 km Rs1.46bn

الجهةMinistry of Physical Infrastructure and Transport
الميزانيةRs286.48bn (allocated)
الحالةجارٍ
المصادر
Nagdhunga-Sisnekhola tunnelNot disclosed

98% complete, operations expected from mid-July 2026 (single source)

الجهةDepartment of Roads
الميزانيةNot disclosed
الحالةNear completion
المصادر
Grid connection expansionNot disclosed

Connect 670 MW hydro and 370 MW solar to reach 5,535 MW installed capacity

الجهةMinistry of Energy, Water Resources and Irrigation; NEA
الميزانيةNot disclosed
الحالةمخطط له
المصادر
East-West Highway Hetauda-Narayanghat upgrade (ADB SASEC)Not disclosed

International bidding for three ADB-financed contracts (SHINER/OCB/PHN/01-03), closed 12 Oct 2026

الجهةDepartment of Roads, ADB Project Directorate
الميزانيةNot disclosed
الحالةBid evaluation (estimate)
المصادر
Janakpur drainage and road improvement (ADB URLIP)Not disclosed

Drainage, road and footpath works under the Urban Resilience and Livability Improvement Project, bids closed 7 Jul 2026

الجهةMinistry of Urban Development, PIU Janakpurdham
الميزانيةNot disclosed
الحالةTender closed (estimate)
المصادر

فرص الأعمال

Why-now and target buyers for the other 4

يحصل الأعضاء المجانيون على ملخص يراجعه شخص بالبريد الإلكتروني لما يصل إلى 3 دول شهريًا (يُرسل خلال 24 ساعة). ويحصل أعضاء BUILD عليها جميعًا.

عرض الكل — عضو التحليل ‎₩19,800 شهريًا 3 دول مجانًا

برامج الدعم الكورية

  • KOICA grant aid (priority partner) · KOICA — Nepal is a priority partner country for Korean ODA; no new individual project was confirmed in this review.
  • EDCF concessional loans · بنك التصدير والاستيراد الكوري — Infrastructure loan programme; no new Nepal EDCF project was confirmed in this review.

إعلانات رسمية

Office of the Prime Minister and Council of Ministers, Nepal

  • 2026-05-29 Finance Minister Wagle presents the Rs2.12tn FY2026/27 budget
  • 2026-03-27 Balendra Shah sworn in as PM and forms cabinet
  • 2026-03-09 Election results: RSP wins 122 of 165 constituency seats

الكوارث · النزاعات · الأوبئة

مستقر 2026-11-07

🌪

Trekking permits to high areas suspended for 3 days over rain and blizzard risk from Cyclone Arnab (from 10/28)

⚔

—

🦠

—

الجهات

التصنيف الائتماني · سعر الصرف

S&P not confirmed / Moody's not confirmed / Fitch not confirmed · K-SURE Not confirmed · NPR -2.8%

العقوبات

—

No country-level UN, US, EU, UK or Korean sanctions programme was found.

المصادر

WORLD MAKING MEMBERS